Linking end dates to another smartsheet
Hello, I am looking for some suggestions on how best to link an end date. I am creating an integrated schedule with fairly simple sheets. I do not understand why I cannot link an end date. I appreciate any suggestions as I am a newer user.
-
Modified SUCCESSORS() function to report more than just direct successors
WHY IS THIS USEFUL? This updated function would allow us to filter the spreadsheet for only the driving path to a particular row#. This would be similar to a filter for critical path, but enable much more flexibility. Current status: I've successfully generated a "Successors" column, listing direct successors of each row,…
-
I created a date column to generates dates by adding few fields but I am getting an invalidoperation
my formula is returning number of dates, as in adding dates.
-
Stopwatch Style Time Tracker
I believe the community has been looking for a solution for years. I have successfully created a way to have Stopwatch Style Time Tracking – On any sheet, at the parent or child row, by individual, and allowing manual edits! This is without using Resource Management. I used Bridge to handle the automation and two sheets…
-
Stopwatch Style Time Tracker
I believe the community has been looking for a solution for years. I have successfully created a way to have Stopwatch Style Time Tracking – On any sheet, at the parent or child row, by individual, and allowing manual edits! This is without using Resource Management. I used Bridge to handle the automation and two sheets…
-
Cross Sheet Counting
Hello, I have two sheets. One one Sheet I have a column with a drop down of names. I have another column with a dropdown of yes and no. On another sheet, I have all the names as rows and 2 columns. One column is named Video Missed and the other column is named Video Grace. What I need to happen is this: On the first sheet,…
-
Carry over info from one sheet to another
Hello all, I have a source sheet that i trigger an form from another sheet (i embedded the form link to the email). My issue now is that i need to get the ReqID (from source) and have it read only in the new form, that will record in the destination sheet. Bottom line i need to find a way to link the ReqID from source and…
-
Cell Links Between Sheets Don't Work Consistently
Hi - I have set data mesh cell links between multiple SmartSheets that I own. The properties of the columns on the different sheets match. In the Data Mesh set up, I've selected: To overwrite content To create cell links To run immediately I have multiple instances where data changes on the source sheet and does not update…
-
Linking another Sheet
Hi All, I am having some challenges which I was hoping someone might be able to help me with… There is an existing Smartsheet that a project team uses to display new product introductions. As this sheet is updated in real time and I am not in that team, I can't add fields that I want to track into that sheet; however, some…
-
Desired target sheet for "Reference Another Sheet" is grayed out!
I'm attempting to add a reference to another sheet (via Reference Another Sheet), yet the sheet is grayed out. It is in the same workspace, and I have Admin access to the full workspace, including when I check this specific sheet. None of the other sheets in the workspace are grayed out. It has to be something with this…