-
Datamesh Whirlpool
I am looking for some assistance.. I have 3 grids (1) A Customer request log that is specific to a project ID (2) An Engineering Response Log that I was intending to have Engineering respond to the customer Requests (3) Our project Status report which shows some high level information and schedules our engineering team…
-
Data Mesh
I have inherited a couple of worksheets. One of the sheets is basically the dataset and the other is MOSTLY a sheet FULL of links - individually set up links. It works fine to the best of my knowledge, however, I'm wondering if there is something to gain from setting up a datamesh? Are there advantages to datamesh over the…
-
Sheet Connection to a DataTable vs DataMesh?
Hello everyone - I have a DataTable with 40K+ rows and would like to sync a subset of those rows to another Sheet. Is it best to connect the target sheet to the DataTable with a filter via a Connection, or would it be better to create an interim sheet that has a subset of rows from the DataTable and then use DataMesh to…
-
Don't want to show the DataMesh Lookup Value
Is there a way to use the DataMesh Lookup Value (in this case an employee ID #) to match rows but not actually INCLUDE the Lookup Value on the target sheet (or at lease make it not viewable)? I want to share information on the target sheet with groups of people that are not in our department without sharing the employee ID…
-
DataMesh Source Matches
When using DataMesh, is there any way to identify which rows in the source sheet did NOT match on the target sheet?
-
How do I get Datamesh to create new rows when lookup values match, but mapped columns have different
I've created a form which collects some common data, and then multiple requests, each with their own data. For example, I'm collecting the requestor's name, and 25 bits of data they want added into our system. The 25 bits of data all share the same properties, but it's very unwieldy to have all on a single row in the…
-
Data Shuttle or other solution?
Hello, I am trying to figure out the best solution to a project. Basically, we have a system outside of Smartsheet that will not connect to Smartsheet (old system) and we do not want to pay to integrate them. I want to manually upload exports from the legacy system (.CSV files) into a preformatted Smartsheet sheet on a…
-
Ownership of DataMesh and DataShuttle Processes
Hey There - I have a number of DataMesh/DataShuttle processes that I've setup, and realizing that our team does not have access to them b/c it's under my account. I assume others have run into this problem in the past, interested in how others have handled this situation? Is there a delegation feature of sorts?
-
add data with hours - formula or something else
Como que eu faço para somar datas com horas exemplo (18/04/2023 15:00:00 - 06/04/2023 13:00:00 ??) Translated by Moderator How do I add data with hours for example (04/18/2023 15:00:00 - 04/06/2023 13:00:00 ??)
-
Data Mesh: Source vs Target sheets
Hi all, I'm creating a work flow to integrate a number of services that my team offers. There is a work sheet that captures all projects sent our way and assigns them to 1 to 3 services - and those projects show up on their respective work sheets via Data Shuttle. Currently - I have cross sheet formulas set up such that…