Moved a sheet and now the data won't show up in reports
I had a full project plan in one folder. Then, I saved as new in another folder and deleted the original. The original plan was showing up in reports just fine. But, the new version will not show up in any reports. I have ensured that the new folder is selected when I build the report. I've even created test reports that…
-
Approval: two users/same level
Hello, Is there a way I can send an approval form to two managers who both need to sign off on each staff member's annual leave? I can do it if I send to Manager A first and then Manager B once the first step has been completed, but wondered if there's a way to do them both at the same time that I'm not seeing...?
-
Table of contents in a large sheet; use of forms
hi, I use one large sheet to manage many different legal tasks across my team (1,000 rows currently). The sheet is divided to many sub sections/categories, main tasks, sub tasks etc. Wanting to add a new main task to a category, the user needs to scroll down to find the right category which is time consuming. Two questions…
-
Unrecognized System Contacts
I'm seeing behavior in a sheet that I'm not sure if this expected or not. I am a known contact in our corporate instance of Smartsheet. The screenshot displays content in a sheet column that is created by submission of a form. For this particular column, it's populated from an email address in the form field. Submitters of…
-
Remove Mouse hover over pop up tool tips on menu bar ribbon
Is there an option to remove the pop-up mouse hover tool tips on the top menu bar ribbon? It is getting in the way of the feature buttons and has become very annoying. Thank you!
-
Multilevel Collect/Sumifs Formula Difficulty
I am attempting to parse a large amount of sheets together and have hit a snag in a formula. My data looks like below: H | A | B | C 1 | 7 | 4 | 9 0 | 2 | 1 | 5 1 | 5 | 3 | 1 H is a helper column displaying a 1 if the data should be utilized and a 0 if not. I need to reference a range as a whole in order to keep my number…
-
Milestone Tracking Report - Numerous projects
Hi all I'm trying to create a status report which would roll up project tasks and their progress into an easily view-able report and/or widget The data will be across multiple sheets and I'm trying to find a way to trigger both active, complete and in progress data sets so that I can target the relevant stages inside of…
-
Is the Parent Row expanded?
Is there a way to know if a parent row is expanded (that is the + sign was clicked and the children are visible)? For example, my sheet contains 3 rows that are parents (Orders 1, 2, and 3 below) each representing a different order. The children of each parent is an item in that order. For sake of discussion and…
-
Scrolling with a mouse wheel
This is a minor thing but trying to figure out how to scroll up and down in my sheets using the wheel on my mouse. This works in every other piece of software I use but in a Smartsheet I have to use the slider bar on the side to move up and down through a sheet.
-
Automation Using Dates to Generate Reminders
Hi Everyone, New to Smartsheet so sorry for the rudimentary question. I'm having trouble getting automation to do what I want it to. I have a project sheet with multiple tasks with various due dates. I'm trying to send reminders prior to the due date. I do the following: Trigger: Run Once: On: Date Field: Due Date: 9:00AM…