This may be a longshot, but I am wondering if there is an easy way to track what a delay is within a project?
My best thought would be to make it a manual field within sheet summary that is a dropdown. It would be called something like Project Delay with dropdown selections like: Customer, Supply Chain, Sourcing, etc.
Not sure if there is some way to make it a formula or if maybe it can pull from certain fields (which I can do easily, but then it is not uniform)? I would like to not make it manual, but it may be the only way.
This would then pull into a report for management to view.