Connect with peers, share your expertise, and inspire what’s next in Smartsheet — from proven practices to practical how-to insights from fellow users and product experts.
Sign in to join the conversation:
Is it possible to save custom views for columns?
I would like to be able to show, hide, sort, and order columns via a template. I am able to filter based on specific conditions but I also need to be able to view the data a specific way.
Hi Mike,
You can use filters in the sheets to show specific rows or use different reports to sort rows and to hide or change the order of columns. It sounds to me as multiple reports that are sorted and arranged in the specific views that you want and need would be the best solution.
Best,
Andrée Starå - Workflow Consultant @ Get Done Consulting
Thank you. this is what I have done but just wondering if it was possible without having to use a report.
Happy to help!
Mike
have you tried setting up a dashboard to view your data in ways that will be more graphically appealing to the user?
Otherwise, I dont see an easy solution.
Hope that helps
Richardr
The SSFeatures browser extension allows you to save and load column "Views" for column visibility, as well as saving sort "settings" for sorting.
To use SSFeatures' column views:
Click the "Hide / Unhide Columns" button and use the Save button to name your view. Load it instantly with one click whenever you need that configuration.
After you click "Hide / Unhide Columns", you'll see a popup that looks like this:
Use "Save" and "Load" to create column views.
You can read more about this feature here:
To learn how to do save and load settings for sorting:
Best!
Disclosure: I'm the creator of SSFeatures.
I'm looking for a way to attach notes to a sheet that isn't attached to a specific row. Rows for many of my sheets are cleared out in preparation for the next iteration of the project, and I need a notes/comments field that remains with the sheet even when the rows do not.
I have a workspace that I am looking to move items from into a new workspace. The reason I want to do this is becasue there are individuals that have access to the original workspace that do not need access to everything that is currently in the workspace. In the original workspace is a MAIN document that holds all…
How to use Smartsheet AI/automation to automically write project status?