Connect with peers, share your expertise, and inspire what’s next in Smartsheet — from proven practices to practical how-to insights from fellow users and product experts.
Sign in to join the conversation:
desperately need it!
It's possible... but there are issues when copying/pasting large amounts of data. The output is inconsistent. Sometimes the formulas copy over, and sometimes just the data. Its a headache for sure. Try doing all of your columns, If that doesn't work, try doing just a couple at a time. Overall it might be necessary to copy one column at a time, or even just a set of cells.
Has there been any updates on copy/paste columns within a sheet? I haven't seen any progress on this and it would seem to be a basic requirement.
I am having the same issue. This is a big deal for us to be able to copy/paste multiple columns from Excel.
Hi there, I was wondering if there was a way to hide milestones on a current project plan, for example to use in a second year of a project but the milestone is not visible until it is activated, or shown in the project plan? Many thanks!
Hi I have charts on a dashboard that capture our customer surveys. There are 2 charts. One showing the number of surveys sent and received each month, the number received. The other one is the overall rating. The data is gathered from 2 reports. At the moment every month I have to edit the chart and update area to include…
I am the owner of the Workspace, Sheet, Report, Dynamic View, and the Dashboard. Today I made a change to the dynamic view, saved it, and now I cannot see it on the dashboard. I receive a message that I need to reach out to the "owner" (which is me). How can I fix this situation so I can see the dynamic view on the…