Connect with peers, share your expertise, and inspire what’s next in Smartsheet — from proven practices to practical how-to insights from fellow users and product experts.
Sign in to join the conversation:
Hello,
I am trying to create a chart from a report to have in my Dashboard. I have a report pulling my Engineer's Hours per project, and would like to create a way to sum all those up and create a graph showing this.
Any help?
It may be easier to create a Metrics sheet that sums all of that up and then use that for your Chart.
How would I go about making the Metric Sheet?
There are a few different ways. The two easiest would to be to create a grid with Engineers on one axis and Projects on the other (column heades in bold). For this example I am assuming your master sheet is setup with the Engineers listed in one column, Hours listed in a second column, and the Projects listed in a third column.
.
Engineer Project A Project B Project C
Project A Project B Project C
Engineer A
Engineer B
Engineer C
You could then use a SUMIFS formula similar to the following:
=SUMIFS({Master Sheet Sum Range}, {Master Sheet Engineer Range}, $Engineer@row, {Master Sheet Project Range}, [Project A]$1)
{Master Sheet Sum Range}: Use the appropriate steps for cross sheet referencing and select the column in your Master Sheet that contains the hours to sum.
{Master Sheet Engineer Range}: Same as above except selecting the column housing the Engineers' names.
$Engineer@row: Leave as is. References the Engineer's name in the Engineer column on your Metrics sheet for whatever row the formula is on. Note the $ to lock the column reference.
{Master Sheet Project Range}: Same as above ranges except selecting the column housing the Projects.
[Project A]$1: Leave as is. Note the $ to lock in the row reference.
When putting the formula in the first cell of the table ([Project A]2), this will allow you to dragfill the rest of the table without having to update the formula for specific data.
You could also flip the table so that the Projects are listed down the first column and the Engineers are listed across the first row.
To provide a visual reference for the example above... The first screenshot is of my Master sheet and the second is of the Metrics sheet.
You can then use the Metrics sheet to build your Chart widget in the dashboard.
Is there more info regarding this matrix formula. I am trying to use this, but have questions.
Recently i have been seeing "Form Unavailable" show up on Forms taht have worked without issues for ages. I thought it might be connected to Table View, but I am not sure for certain. One is on a newly created form and the other is on a sheet that I converted to Table view, because we were hitting the 500K cell limit (so…
Hello community, What can we do if I cannot delete the data shuttle workflows that I created myself? Thanks!
Hello, I have created a dashboard and added some Metric Widgets to my dashboard that is pulling text from the profile data sheet that I created. However, on the screen shot below, where it is pulling information into, I want to change the formatting (no bold, smaller font). But when building the dashboard, it doesn't let…