Re: Showing multiple dates from the same sheet row in a calendar
Hi @Elijah,
In "Project Settings" there is a section for "Date Range Display". This pair of dates is what populates the Gantt and Calendar views. There is not an option for multiple ranges being displayed for the same row.
All the best,
-Ray
Ray Lindstrom
Re: Showing multiple dates from the same sheet row in a calendar
I completely agree with the above desires to have a gantt chart / calendar view with multiple dates on one row! What is needed to have this feature be developed? I've even looked to try to export my data and implement this as a bar chart on excel which is ridiculous when the easiest and cleanest solution is to have Smartsheet to implement this requested need :)
Re: Mapping Diagram/ Export Documentation of workflows
Just re-read these comments. A feature to map out automation (+ functions in sheets) would differentiate smartsheet in a world getting very crowded with automation tools!
swfascetti
Re: Mapping Diagram/ Export Documentation of workflows
This would be really nice. Currently I just build a lucid chart , but A I would be much faster!
Tim C
Re: Why isn't automation working?
Hi - I was able to figure out my issue as well. My conditions were incorrect. Thanks again, Pat
Re: How to change Time Zone in Smartsheet App
Short answer you cannot do it on the mobile.
Long answer:
To change the time zone in the Smartsheet Mobile App, you actually need to adjust it through your Smartsheet account settings, which are typically accessed via the desktop or web version of Smartsheet. The mobile app itself does not currently offer a direct option to change the time zone.
Best method is to have them use the web version and set the time zone, then log into the mobile app and hope it shows. I have not tried this though.
Ape_Man819
Re: Vlookup within Form, Able to Overwrite
We use Dynamic Views to review specific data for users. And I was just experimenting with having a report setup for "Current User" and having the report drive the Dynamic View. If you Current User = Requestor, then when they go to the DV, they should just see their requests and just the params that you want them to see.
Also, we send out monthly update requests for each non-complete line item and include the columns that you'd like them to see and update. This is an automation and it works great.
Re: Date format changing
I had this same issue (I'm in NZ so have the same UK date format). I ended up logging a ticket after checking all users who were sheet owners had their settings to NZ format, as it seemed to be some sort of technical glitch.
Re: Rich Text Formatting for Conversations/Comments
The ability to create a much richer experience for row comments (eg. text formatting; sections; to do's, etc..) would be a quick win that would dramatically improve the overall experience for this [almost] great tool!
Re: Why can't I link the "End Date" from another sheet? What makes this column unique?
Hi @Devin C.
If you have the sheet set up with dependencies enabled and are using the column called End Date as your "end date column", you cannot link this from another sheet - it will be calculated based on the start date and duration.
Hope this helps.