How can I link predecessors from one sheet to another?

A task in sheet A is required to be completed before a task in sheet B can be worked. Is there a good way to do this? Note: I also have a master sheet that is fed from the values in sheet A and B combined. I want to be sure the integrity of that link carries over into our master sheet.

Thanks!

Mandie R

Sr Project Manager

BVOP - CPD | CAPM | CBDA | CSM | CSPO | ECBA | SAFe 6

Answers