How can I display the timeline from another project?
Options

RitaMichel
✭✭
I have two projects that are run separately, but are connected. I therefore would like to link project 2 to project 1. I was able to do that through adding a Hyperlink in the respective cell. However, in the sheet of project 1, the timeline of project 2 is not displayed. How can that be done?
NB: I also linked project 1 to another smartsheet where I listed all the meetings separately, and this timeline is displayed.
Thanks for the support
Answers
-
If I understand your question correctly, the fastest, easiest way to reference both schedules on the same page would be to create a report that references both sheets. Is this feasible?