I speak of Brazil, I need the lines to be numbered automatically, for example: 4 - General Projects, a subtitle 4.1 - Electrical Projects and another subtitle 4.1.1 - Terreo Pavement Project, can you do that?
Annex follows example ..
AttGelson
Hi Gelson,
Unfortunately, there isn't a way to change a setting, but I've seen some workarounds. I'll get back to you when I've found it.
Look here: https://app.smartsheet.com/b/publish?EQBCT=127eaded62f140e7b32ab38ebdb35e4a
Would that work?
Have a fantastic week!
Best,
Andrée Starå
Workflow Consultant @ Get Done Consulting
I am trying to create a Form that requires the user to supply information related to any item existing in the Primary Column. If I pull that existing field into my form, the user entry is a free-form field and I can't figure out how to restrict it (other than validating by data types). If I add a new field with a dropdown…
Is it possible to display both the planned and actual duration for a single task on a Smartsheet Gantt chart? I would like the Gantt bar to show the planned duration (e.g., in blue) based on a Planned End Date column, and then show the actual duration (e.g., in green) based on an Actual End Date column. Can the Gantt view…
I noticed in the Board View tags are grey by default but in the how to videos, in the Board View some of the tags are colorful. I'd like to leverage that same functionality as I'm building a research repository with many different types of research in it and a visual cue would be lovely. Can anyone assist? I attached a…