I have a sheet that contains a column where I've inserted images. Is it possible to have those images show up when I merge into google docs? I tried but it errored. Do the images have to be a certain size or file type?
Thank you
Hi,
Yes, it is and I'm not aware of any limitations in size. What does the error message say?
Have a fantastic week!
Best,
Andrée Starå
Workflow Consultant @ Get Done Consulting
Sorry this project completely fell off my radar.. The error I receive is as follows
"An unexpected error occured. We were unable to export a row. (REF #: "1673784837072772")"
I have the image attached to the row (they are .jpgs) and I have them inserted into a cell in the column titled "Logo". In google docs I've inserted the merge field for the "logo" column.
No worries!
Have you looked at which row it is? What happens if you remove or move the picture on that row?
The error doesn't specify for a row, it appears to error before any merge takes place.
For reference, here's 3 screen shots
1. The smartsheet I'm using for the smartsheet merge with google docs.
2. The google doc used with smartsheet merge
3. The error message itself
What happens if you just create one document instead of 38? Can you try them one by one to maybe find the issue?
I tried it for 3 of them and got the same error. It would be just as easy for me to attach the image to the merged document as it would to go through 38 rows one at a time.
Ok.
If you haven’t already, I would recommend that you reach out to the Smartsheet Support Team. Smartsheet Support Team
Hope that helps!
I have a sheet that serves as a log for repairs to equipment. I set up a config to pull equipment detail from sheet A into repair log (sheet B) using equipment ID as the look-up value. Users use a form in sheet B to request service. If multiple requests are submitted for the same ID number (which is common as equipment…
:) Replacing a JIRA system that was not really used well with Smart sheet and Sales force in a united front to try and perform work flow, report out, and track time, then export for billing back to Salesforce. High level, we have a pre sales sheet that captures input from Salesforce on win, loss, and or type of project.…
Good morning, I'm working with Bridge and still getting used to the capabilities, and more importantly, the syntax. Perhaps this is not the best option as I am generally pretty good with code, and there is a lot that seems to be hidden or overly simplified. So my "simple" question is how do I set up a Bridge to add data…