Referencing checked state of Flag symbol using formula

BMar
BMar
edited 12/09/19 in Archived 2016 Posts

I want to use a Flag column to mark high-priority tasks and calculate a reduced lead time.

 

In a Due Date column I use a formula to add 7 days to the Received Date.  I want to change the formula so that it adds only 5 days IF the flag is checked.   I can't seem to find out how to reference the value of the flag cell, though.  Is there a way to do this?