I have a series of projects that I need to report out the End Date for each of the milestones and I'd like to do that in a table. So here is what I have. I have 7 projects, each with 7 Milestones, each with 1 dates. I laid those out in a report as 3 separate columns - Project, Milestone, Date.
So what I need a table with the Projects on the Y-axis, the Milestones on the X-Axis and the intersection of those 2 to be the End Date. I tried a number of methods in Excel but I'm not an Excel guru. Is there a way to do this without the need of a proper reporting tool?