Is it possible to calculate (or even approximate) a LOG function in Smartsheet? We regularly use the below formula to calculate A/E fees:
(35/LOG(Construction Cost))-1.15)*(Complexity Factor) = A/E fee %
I have a sheet setup where someone can enter a construction cost, and a lookup table for the complexity factors based on project type, but I then tried to input this formula for the fee %, but I get an #Unparsesable result. Am I doing something wrong, or is there really no way to perform this calculation in Smartsheet?