Hello all,
Ive looked and cant find this one ( or i didnt type the right thing in search ).
I have several deployemnet dates set.
Im wondering if I can have all dates change if I change one above them,
EXAMPLE:
On 03/14/17 I have a deployment scheduled.
On 03/21/17 I have a deployment scheduled.
On 03/27/17 I have a deployment scheduled.
On 03/28/17 I have a deploymnet scheduled.
If the deployment on the 14th got delayed and pushed back by two days, is it possible that the rest of the deployments are also pushed back by two days.
Basically I want the changes done to one higher date to reflect in all the ones below it.
Is that possible?
Thanks ahead of time!