Hello
I have a number of reports where I have added additional drop down selection options but when i try to add these to existing reports they do not come up as an option
Report there is no Feasibility/Design status to add
This is the source sheet i have removed Design and replaced this with Feasibility/Design
How do i get the report to link to the current source sheet and not a historical version, I though the system worked in real time?
Thanks for any help you can provide
Laura