I have several columns within a Grid Sheet. I only populate the first row, as I use this Reporting Sheet data to report and create dashboards.
The values in the first row of the Grid Sheet are linked (pulled from) another sheet. Once all data is populated (populated from the source sheet and reflected / cell-linked in the Reporting Sheet), I have a formula that checks a box (checkbox column). Workflows don't seem to be triggered by this change within the sheet.
I know that Linked values can not trigger automation workflows, but can formula values from within the same sheet trigger a workflow? Suggestions?