Hi all,

I have been in a business for around 18 months and recently I have been promoted to run the installation side of the business with 6 direct reportees over 60 sites. Due to the nature of the business each of these sites they can last up to 2 years but with only one room being installed at a time.

We have a master database of where the jobs are logged but not currently a way to manage them and track progress and measure KPI such as on time and completed first time.

I have looked through the templates but there doesn’t seem to be anything that is suited to this.


Any ideas?


thanks