Enable Total Float to work with multiple predecessors.
Currently, Total Float will only calculate correctly when there is a single predecessor for an activity.
Sign in to see the current vote count, add your own vote, or leave a comment.
Yes, I would love to see this capability developed as well. Thank you!
This capability would be very useful for accurately showing which tasks are close to affecting critical path. As currently implemented, I don't see how TotalFloat can be used reliably since only the simplest of projects will not have some tasks with multiple predecessors.
This request was made almost a year ago and the discussion with moderator goes back even further. Does anyone know if its being worked on? Float/Slack is such a helpful/time saving piece of information when managing a schedule.
Another year down…almost. Any word? I had a cobble together my own highly specific code to very poorly approximate Total Float for my work. Our schedules are complex with heavy dependencies…and float is crucial for us.
Most customer's metadata houses their profile data, some from intake sheet and some either cell linked in or brought into metadata using formulas. Needs change after design and often the new data point needed comes from non-metadata templates, which can cause a blocker if methods used are those above. If it were possible…
Having the ability to auto-resize the Calendar App view based on the widget size is needed. We have a "Due in 7 Days' calendar for our dashboards and would like it to be anchored at the top right. Unfortunately, as currently designed, the calendar takes up a significant amount of space and must be moved to the bottom.
Our sheets & workspaces require many people to have Admin level capabilities, which means that when someone requests access to a sheet or workspace, that email is sent to every Admin. This causes confusion and higher risk of no access granted (because people have learned to ignore the emails) or the wrong level of access…