-
Best way to have a client facing dashboard act as a communication hub?
Hello All! We have a client facing dashboard (draft) setup, but we have not rolled it out yet. I have included a screen shot. We are in process of finalizing a more broad set of information. Pretty basic setup as of now. I would like this to be a client eco system, where they get all of their information and do all of…
-
Rename Folders Provisioned by Control Center
Hello All I have provisioned about 100 project toolkits through Control Center, and I don't like the way the folders in Smartsheet are sorting. Can I rename the folders in Smartsheet without breaking anything with future global updates? I would like to rename the folder for all the projects provisioned to have the unique…
-
Dynamic Reports and Control Center Programs
I am having an issue with our Dynamic Reports. We now have 2 separate Control Center programs that both look at the same Dynamic Report to list all of our high severity risks and issues for our projects. We are actually transitioning from one program to another. All of the projects provisioned from the old program were…
-
Jira Integration into Control Center
My team currently uses a Jira integration to track ticket statuses for our Acquisitions. We are standing up Control Center and have been told the Jira integration will not be able to be copied over. It would be great to have this integration available in Control Center as well. Without it we need to manually enter the…
-
What can I do If I archived a project (from Control Center) by accident and I need to restore it?
I accidentally included in my archive workflow a project that wasn't supposed to be archived. Is there anything I can do to restore it or something similar?
-
Can I set up an automation to archive a project from within a sheet inside the folder project?
We're looking for a more efficient way to archive our projects. I was wondering if is it possible to set up an automation inside a sheet (Let's say inside the Project Charter template) triggered once a box is checked by the PM to archive the whole folder and disabled the automations from other sheet. Any one has done…
-
SCC Global Update - Add number formatting
Add the ability change a columns number format. I added a new column but was unable to change the number format to percentage.
-
Both reference ranges in a column formula are not globally updating? Any advice?
Hello All, I have edited a column in my template with a new formula. This column NOW has a formula that pulls in data from a reference sheet (metadata sheet). I have tested this out through a provisioning test, and it works! I Love it! This is a screen shot from my template sheet. =INDEX({Metadata Range 1}, MATCH("Project…
-
Control Center Error
I'm not sure why I am getting this error. Has anyone seen this before?
-
Pivot App - Include Pivot Charts in Template
We have a Workspace template that is duplicated (in control center) for each project but the pivots aren't included in that template and have to be reconfigured each time. This is unrealistic for the volume of projects we need created. Same applies for other premium app configurations, too.