How to calculate days a ticket is open/closed
I am trying to calculate how many days a ticket remains open but I also need that formula to stop counting if the "Ticket Closed Date" column is filled in. I have tried a couple but they keep coming back as errors. There are multiple selections for the Status of Ticket column... Work Has Not Started, Work Has Begun,…
-
Can't Create a Single Grid Sheet anymore? Why did this change?
I am unable to easily create a grid sheet unless I do it through the Workspace panel. I used to be able to right-click anywhere in my sheets folder, for example, and add one, or hit the create button, which offered options. Now, the create option directs me to the same location as the left navigation, and there are so many…
-
Row Change Notification Being Triggered by Rows Added Through Form
Hi there I've setup a notification that's triggered by a row change. However when a new submission is made via the form (i.e. a new row is added via the form) it's triggering the notification as well. The notification is: "Trigger: When rows are changed AND when column1 changes to any value, or when column2 changes to any…
-
Cell-linking from another sheet in the Predecessor column
Please enable the ability to use the cell-linking from another sheet in the Predecessor column. Importing dates from another sheet in a new row and then using them as a predecessor can disrupt the duration and critical path of the project. Thank you.
-
Critical Path using a Start-to-Finish predecessor
This is a scenario for projects where the finish date of the last task is dependent on the start date of a task/milestone (most likely from another project). For example, if the project is to decommission an application then disabling the application (last task) cannot occur until the new application goes live (start date…
-
How to get the count of unique values from a list of repeated unique values
I have a list of people lets say Jon Sam Rick each on of them is assigned to a colour lets say any combination of colours for something that looks something like this ( see screenshot). How can I count the number individual colours for each person. For example Jon has a combination of 5 red and 5 green so his count should…
-
Cross-sheet predecessor without using cross-sheet reference
In sheet 1 there is a date 1 which is a predecessor (SF type) for last task in sheet 2, so that date 1 is later than any task in sheet 2. When I use a cross-sheet reference to import the date 1 into sheet 2 and then simply use it as a SF predecessor, it does two things that I need to avoid: it erases the critical path for…
-
Conditional Logic - Drop Downs
Hi there - I have a form, and am using Conditional Logic to show/hide certain fields, but had a question. Is there a way to show a field and only certain selections from that field? Here's an example: Person selects Retailer A from a drop down. As a result, a drop down (Promotion Options) appears (among other fields). What…
-
Editable Font Size and Colour for Data Labels on Charts
It would be helpful to have some control over the size and colour of data labels for charts. e.g. if your dashboard font sizing is consistently a smaller or larger size than the default for data labels, it looks untidy, often data labels appear too large on a chart as a result of the large default font size too.
-
Sort Chart Data in Dashboards (Ascending or Descending or Alphanumeric Order)
Please add a feature that lets you sort your chart data in ascending order (e.g., 1, 2, 3, 4), descending order (e.g., 4, 3, 2, 1) or alphanumeric order (e.g., 1, 2, 3, a, b, c).