Jira Connector: Where did the lightning bolt shortcut go?
There used to be a jira connector shortcut that looked like a lightning bolt on the vertical menu that seems to have disappeared for everyone at my company. Does anyone know how to get this back?
-
Sheet output without Column names
How can I print a sheet without the column names printing? I would also like to be able to export to an excel spreadsheet without the column names appearing in the spreadsheet. How can I do this?
-
How to integrate Smartsheet into Google Calendar? How to import Excel info into existing Smartsheet?
Our Construction Company is wanting to have a Smartsheet to keep track of data for our weekly schedules. How do I get our schedule to automatically appear in a Google Calendar? As of right now, nothing is even showing up in our Smartsheet Calendar, so I don't know if it is a problem with the wrong column being made primary…
-
Integrate with Outlook with Dates and Times and Assignee Information
The outlook integration as it exists is nice if you only have one or two projects. As a single user I manage hundreds of projects at a time I would like to be able to sync my calendar to outlook in a more integrated format. For example, when i set a task or appointment date in Smartsheet I would like to be able to…
-
Project status synchronization between 2 sheets
I have 2 sheets (2 project trackers) and need to present the status in a "master" tracker based on a data from the "slave" one. The problem is that in the slave there could be couple (even 20) rows that are connected to the one project in the master file. They are connected via Project Name column. I need to somehow merge…
-
Pulling data from website into Smartsheet
Hello I am creating a website using Wix and I am embedding a smartsheet form into a page that is only accessible if a user is logged in to the website. Is it possible to pull their name and email into the form automatically? TIA
-
Importing all columns from MS Project
I have an MSP plan that contains financial information. When I import in to Smartsheet it does not import these columns. I have tried exporting to xml then importing but get the same issue. Is there a simple way to import all columns from an MSP file into Smartsheet? Am I missing something?
-
Import from .mpp file not perfect?
Recently have been testing out functionality within Smartsheet to compare to other products that are very similar and there seems to be a critical issue with the import functionality from MS Project .mpp files. See below from the same .mpp file: PCH-36 should be a parent on the same level as ASC/OQR, the section is…
-
Which Fields are imported from MS Project?
Hello - Can someone please enlighten me as to exactly which fields are imported from MS Project into SmartSheet? As far as I can tell, the (non-custom) following fields get automatically imported: -Task Name -% Complete -Duration -Start (to "Start Date') -Finish (to "End Date") -Predecessors -Resource Names (to "Assigned…
-
Smartsheet PDF Exports Break Links Over One Line?
I am having an odd issue in using Smartsheet and exporting Reports for the first time. I created a report from one of my sheets, with one column that includes a hyperlink. It's a pretty long link, but the text is wrapped so it simply splits the link up with a line break in the export. However, the actual HYPERLINK that it…