Hey all, I'm evaluating Smartsheets for my business and trying to determine whether workarounds exist for some necessary calculations. Three big ones are cost calculation, weight calculation and inven…
Hey All! I have a question about how to have predecessors or just tasks in a schedule to automatically update when they are moved in the schedule. I am trying to create a production schedule for our S…
I want to use the formula: =TEXT(*CELL WITH DATE*,"mmmm") But this doesn't seem to be a valid formula on Smartsheet. So if I have a cell with the date "01/01/19" - I want it to show "January" in anoth…
Hi, I am looking for a way to log the time a row's project status column is changed to on hold and then stop counting when the status is changed. It would be possible for the project to go on hold mul…
Hello, To proof I have to first upload a file, but what if the file had already been attached to the row; is there a way that an attached file can be automatically moved into proofing. Thanks
As can be seen in the attached screenshot I have data that is brought into the sheet from a web form. A time and date stamp is attached at posting (this time and date is correct) however, the date col…
Is it possible to scan a barcode-find the line where the barcode is already on and then put a check mark in to update the status of the line? Basically I am scanning a a product into the Smartsheet. I…
I have three columns in my schedule sheet. Duration (native column) hours and resource allocation. I would like the Duration to be my hours divided by my resource allocation. So If I plan to put 2 peo…
I have a form I'm using as a maintenance work order log. I have them fill out a form, which in turn fills out the order log. Is there a way to have them enter multiple parts and descriptions and have …