IF, AND/OR, NOT formula with multiple conditions for a symbol column
Hello, I have been using a symbol column to monitor updates for a master sheet of all of my departments projects: =IF([Exec Summary Update]@row < TODAY(-14), "Red", IF([Exec Summary Update]@row < TODAY(-8), "Yellow", "Green")) However, I need to update this formula to include criteria that states NOT if the Phase@row is…
-
Control Center Automation Ability to Trigger Document Sets Specific to Project Category
We would like the ability for Control Center automation to be configurable to trigger different document sets based on the category selected in the project intake sheet. For instance, if the new project request is Category 1, we would like to trigger a set of reports and sheets specific to Category 1. If the new project…
-
Programme Status based on %complete
Hi There, Apologies if this has been addressed elsewhere, I could not find anything similar. Are you able to status update a programme so to update % complete and the resequence the programme task to start after the today line?
-
creating mid-task lag?
In construction scheduling, we often have weather delays, lag when subs are working out of town, etc in which we need to create a delay mid-task. i.e., contractor A starts a task on 1/2, is delayed until 1/9 due to cold weather than picks back up and completes the task 7 days later than originally anticipated. Is there a…
-
Parent Row showing on multiple rows in a report
Hi, I'm currently using a sheet with information about different projects and need to show a Parent Row on all the other different "statuses" assigned to different Subtasks of that same project, I already have a formula to show the Parent based on their children, but I would appreciate any help on this issue. Attached…
-
Link an entire column from 1 sheet to another
I know you can do this at the cell level, but is it possible to link an entire column? I'm trying to save the time of linking over 6000 cells and want the ability to grow as I know the numbers will be increasing over time.
-
How can I change the WBS phase number for my WBS by phase?
Hello, I am trying to figure out how to change the WBS phase number for specific tasks in my project. For some reason a group of about 15 tasks is assigned to phase 1 in my WBS, but they should be phase 10. The WBS number is showing 10.1, 10.2, 10.3, 10.4 and so on, but the phases for these are locked in. How can I assign…
-
Project Sheet - Static Finish Date
I didn't see a post about this yet, please post a link if this is a repeat issue! It seems like the default relationship between Duration, Start, and Finish is that when you update the finish date or the duration, the start date is kept static, the duration gets extended and the finish date gets pushed out. Is there a way…
-
Network Diagram (Process Flow) View for Sheets
Develop a new view for Sheets that displays connected tasks as a network or process flow diagram. Once you have identified the activities and their dependencies, you can visualize the critical path analysis chart (CPA), known as the network diagram. The network diagram is a visual representation of the order of your…
-
RFI Request for Information Template - can not find
I found the RFI Request for Information Template that I loved on Google so I signed up for a Smart Sheet account. Im logged in and search for RFI Request for Information Template- the search result is a "Status View Smart Sheet" not a RFI Template. See screen shot. Here is a link to reference page to RFI Request for…