-
Shifting Entire Production Schedule Simultaneously
I want to shift the entire Prodiction Schedule of a project to reflect a new start date. How can I shift all Tasks at onec? Or do I need to each Task individually?
-
Wrapping text
Hi, Is it possible to ensure that wrap text is assigned at all times on a sheet? I seem to be adding lots of detail to numerous rows and I have to constantly select the wrap text icon for each row - it would save time if wrap text could be applied to all rows on a sheet. Thanks Tom
-
Naming a Cell
Can Smartsheet let you "Name" a cell, like in Excel? This would be really useful. You could name certain milestones like "Launch Date" and then automatically calculate the dates of other tasks by subtracting/adding from that. For example, the due date for "Approve Launch Publicity" could be =LaunchDate-14 Today you have to…
-
Moving Massive Qty of Rows
Good Afternoon, I'm currently dealing with a minor issue with SS while moving rows. Once a month, we move a single months worth of data from our main Completed sheet to an Archive sheet I have created, to keep record of previous rows that have been marked complete past 3 months. I do this to keep the loading time down in…
-
Formula & Conditional Formatting Update in Reports
I have several smartsheets that have formulas and conditional formatting. These smartsheets are pulled into a summary report. The formula's and conditonal formatting do not update when opening the report. Each sheet must be opened individually in order for the formula's and conditional formatting to update.
-
Moving rows in Android app
How do I move rows within a sheet on the Android app?
-
Save as New
I love how the Save as New now has the ability to include Notifications & Sharing options to be saved; however, why are reminders not included? With dozens of sheets that have notifications and reminders that I roll forward each month, this new feature is still not useful/complete because reminders aren't captured.
-
Tempo Account Field Not Updating in Smartsheet
We are working with a JIRA instance that is connected to Smartsheet and writes data both ways. The JIRA instance utilizes the Tempo Timesheets add-on. One of the fields in a Smartsheet contains a column that is mapped to the Tempo Account field which is a locked, single select custom field in JIRA created from Tempo. This…