Connect with peers, share your expertise, and inspire what’s next in Smartsheet — from proven practices to practical how-to insights from fellow users and product experts.
Sign in to join the conversation:
I currently use the Office365 sign in and would like to change to a regular email & password sign in. I found this discussion about switching to an Office365 sign in, but not one about switching from it.
How do I do that?
Hello,
If you don't want to use the Office 365 login method, enter your email address into the field and then click Continue. If needed, more information on log in methods can be found here: https://help.smartsheet.com/articles/518528-logging-in-and-out
If you're unable to log in with email and password, it's possible the log in method was disabled by the System Administrator for your plan. More on this here: https://help.smartsheet.com/articles/855284-security-controls-enterprise-only
That doesn't work, or I'm not understanding what you mean. At the login page there's no "Continue" button.
I'm prompted for an email address & PW. If I enter my email address and leave the PW blank (because I don't have one since I've been using Office 365) and click login, I get an error.
You could also reset your password by using the link here: https://app.smartsheet.com/b/pwd?lang=en_US
You'll be prompted to enter your email address and then a reset password link will be sent to your email. Once you select the reset password link that was sent to your email —all you'll need to do is enter a new password.
I hope this helps!
Is there a way to check or confirm if an alert from an automation was sent? I have an automation right now that records a date, and then another automation that sends an alert with a message out once that date is recorded. That alert is NOT an update request, it just contains a message. (It doesn't need to be an update…
Hello, I'm having issues with the "Alert Someone" trigger on an automation. If I select the option "Message Only" the emails are being received by the selected person with no issues. But is I change it to "Links to sheet and specific fields" now the person selected never receives the email.
Hi - Having a day with date option would be very helpful in the construction industry; ie. MS Project as an example. It's nice that you can hover over the date and see the day, but for our trade partners looking at paper schedules in the field it would be nice to have it in the column. Thank you