Is there a way to create an alert based on numerous dependencies? For example, if Bill Smith needs to be notified only when both tasks 1 and 2 are complete, is there a way to do this?
There is, but it can become tedious depending on your exact details. What is the maximum number of dependencies for a row? Do you have lag/lead time built in? Are there varying durations such as days vs weeks vs hours?
No lag/lead time. No varying durations. Not sure how many dependencies but not a ton.
Ok. OS to start you would need a row id column that basically duplicates the row number. Then you would create a number of helper columns. 1 for each predecessor. You would use these to parse out your predecessors. Then you would create an additional helper column (checkbox type is easiest to work with in my opinion). In this checkbox column would be a formula that looks at whatever column you use to mark a task complete, searches for each predecessor, then checks the box once all predecessor rows are marked as complete. You would then use this final checkbox column to trigger your notification.
Does this sound like something you would want to tackle? It can become tedious and time consuming setting it up, but once it is set you can use the "Save as new..." feature or save the sheet as a template to be able to use it over and over again.
Honestly though... If it is one time use and a short lived project, it may not be worth the hassle of setting up.
Does it sound like something worth exploring?
I'm looking for a way to attach notes to a sheet that isn't attached to a specific row. Rows for many of my sheets are cleared out in preparation for the next iteration of the project, and I need a notes/comments field that remains with the sheet even when the rows do not.
I have a workspace that I am looking to move items from into a new workspace. The reason I want to do this is becasue there are individuals that have access to the original workspace that do not need access to everything that is currently in the workspace. In the original workspace is a MAIN document that holds all…
Anybody here gets the same problem as I do? This is happening only recently. I have set an automation enabling rows to moved or copied to another sheet. There is no set automation to lock the rows either from both source or destination sheet. But once copy or moved is triggered the rows gets automatically locked at the…