Best Of
Using two different colors of font in a column cell
It would be super useful if there was a update where we can use two different colored fonts in a single column cell.
Re: Attachments for Non-Subscribers
Hi,
I hope you're well and safe!
You could send an Update Request, and all attachments would be included. They can be sent to anyone as long as your permissions are set to allow it.
Does that make sense?
Would that work/help?
I hope that helps!
Be safe, and have a fantastic day!
Best,
Andrée Starå | Smartsheet Expert Consultant & Partner / CEO @ WORK BOLD
✅ Did I help answer your question/solve the problem? Please support with 💡 ⬆️ ❤️ and/or ✅ Answer. This will make it easier for others to find a solution or help answer. I appreciate it, thank you! 🙏
Andrée Starå
Re: Early adopter - New Portfolios feature
Features that are part of the Early Adopter's Program are under NDA, so I can't share details or content in the public Community forum.
However documentation and information is regularly shared and discussed in the private EAP Group! This group requires manual approval so it can take a few weeks to be accepted after requesting to join.
All emails from the EAP program also include a private URL/link to a Dashboard Hub with information on the program and what features are currently active, along with their documentation.
Cheers,
Genevieve
Genevieve P.
Third party extensions
Good morning fellow SmartSheetians!
I just have an off-the-wall question I guess. How is it we can't get some basic features we need in Smartsheet (like being able to sort a filtered list and such), yet if we pay for an extension we can get those features???? Why do we have to consider paying for something that should be readily available anyways???
Just asking. Not trying to poke the bear, but I have been bombarded lately about paying for extensions that should already be basic features. Just curious on y'alls thoughts on it.
Re: Timeline using Portfolio report
I am sorry I cant help, yet I am seeing the same error. I have deleted my reports, recreated them then readded the widget. I cant seem to get around the problem.
Timeline using Portfolio report
I am attempting to use a timeline from a portfolio report on my dashboard but after setting it up I keep receiving an error - Columns used to configure this widget have been deleted or changed.
I have took all filters and grouping off of my report and it still showing this error. I don't know how I can get around this message. Any and all help is welcome.
Re: Dashboard - Show progress using project phases not %s
Another option if you want to show different colors for each stage (just a different visual is all) would be to set up your metrics sheet so that each stage is a separate column then use a formula to populate a 1 in each of the completed stages for each project.
From there you can create a stacked bar chart and adjust the color for each stage using the series settings.
Also… When your numbers align with the stage numbers, you can save your self some typing and add some flexibility by replacing the nested IF with a VALUE/LEFT combo.
=VALUE(LEFT(Stage@row, 2))
Paul Newcome
We need the ability to copy automations between sheets
Please give us the ability to copy automations between sheets. When you have hundreds of sheets already created it isn't always possible to copy from a template that already has the automations in place.
Power Automate - Post Attachments to Row/Sheet
Hello everyone!
I spent WAY to long looking for this answer so I thought I would share it with the Community in hopes of helping someone else.
Problem: Adding attachments to rows/sheet is not possible through the standard SmartSheet Connector
Solution: This can only be done by creating a Custom Connector. It CANNOT be done through the HTTP request. As of writing this, here is the relevant information. On the
General tab
Scheme: "HTTPS"
Host: "api.smartsheet.com"
Base: "/2.0/"
Security
Authentication Method: API Key
Parameter Location: Header
The rest of the info is up to you.
Definition
Url: https://api.smartsheet.com/2.0/sheets/{sheetId}
Headers: Content-Type and Content-Disposition
Body: This must be edited in the swagger editor after creating Action. The body should look like this
" - name: file
in: body
required: false
schema:
type: string
format: binary
"
Be sure to format it consistent with the rest of the Yaml.
The rest of the info is up to you.
Finally Update the connector. You should now be able to use this custom connector in your flows.
Your Atachtion should look like the example below. Key items, you will need to know the Content-type. If you are using ShareFile, you can get it directly from the "Get File Content" step. Just be sure to drill down from the body, ie. @{body('Get_file_content')?['$content-type']}. I used the Get File Metadata step to get the file name. You will need the file extension but not the folder path. Finally, the File MUST be in Binary. If your file is in Base64, use the following: @{base64ToBinary(body('Get_file_content')?['$content'])}
I hope this helps!
Re: SLOW everything runs very SLOW
I know this is an old thread, but are we still seeing very slow performance in sheets?
