Hi,
I have several worksheets, one being the master.
I have figured out how to "copy" a line from one to the other, but when that line changes, it does not update the other sheet.
How do I ensure the two stay in sync?
as an example - in the secondary sheet, the line changes from planned to completed, but that change is not reflected in the master sheet.