Hello everyone,
I am creating a Project Pipeline which consists of many linked cells from many different individual project sheets. The individual project sheets are designed in a way that the information I am accessing is vertical. But in my pipeline, these same values need to be horizontally displayed. I need to link around 20 cells from each project sheet, and it is tedious and a waste of time to individually link each cell from many different projects.
Is there a way I can link these cells and transpose them at the same time, so that I only have to copy-paste a single time from each project sheet?
Any help is greatly appreciated. Thank you!
Max