I know there are many advantages to having many small sheets in Smartsheet rather than one large sheet. However, in some cases, it seems easier to manage to track many small, similar projects on the same sheet.
Has anyone had experience with sheets that have a number of rows near or over the Smartsheet maximum of 5,000 rows.
Since one large sheet could define pretty much everything we do with Smartsheet (we track manufacturing jobs) I wouldn't care if it took a sheet several minutes to load, if filtering, printing and reporting were reasonbly efficient.
If a large sheet (arounf 5,000 rows) won't load, is unstable or drops updates, that would be unacceptable.
Specifically what functions are impacted, by how much and can anything be done to mitigate problems such as a faster internet connection, diiffert browser, faster PC or more PC memory.
I would appreciate any feedback.
Thanks you very much.