Would love to have S/M/L T-shirt icons to visually look at sizing. This would be helpful as a project manager and on a scrum team
Hi,
Unfortunately, it's not possible at the moment, but it's a great idea!
Please submit an Enhancement Request when you have a moment.
Have a fantastic week!
Best,
Andrée Starå
Workflow Consultant @ Get Done Consulting
I am already an Admin of a workspace, but when I enter the sheet to edit, it prompts me that I am a viewer. Has anyone encountered this situation? In the share tab, it shows that I am both an Admin and a viewer. How could a product from such a large company have such a BUG?😫
The black arrow indicates when (around 4:30pm) the mistake was made. I would like to recover a previous version say around 2pm.
I have two identical projects with the exact same data, but the % Complete in Smartsheet is 14% and the % Complete in Microsoft Projects is 4%. Which one is correct