Hi,
Our ERP system exports tasks and the materials needed for those tasks with the same task ID number. We schedule based on the actual task and predicted duration. Is there a way to automatically assign the same start date to the materials needed for the tasks based on the scheduling of the actual task? Screenshot attached.
Thanks!