Hi all,
we have tasks at level 1 and subtask at level 2.
The cardview shows only level 1 tasks.
From the level 1 task I can edit the subtask (level 2).
I would like to add a comment to this subtask, but it is stored at the level 1 task.
Although the comments area shows:
1) "Line 1 Subtask" which is wrong and should be Line 2
2) the edit area to enter the comment shows "Line 1 Task" which should be "Line 2 Subtask"
I believe this is a bug, what do you think?
Have a look at the animated gif