Bug? Comments in subtasks are stored at the maintask if added by the maintask card view (level 1)

Bug? Comments in subtasks are stored at the maintask if added by the maintask card view (level 1)

Hi all,

we have tasks at level 1 and subtask at level 2.

The cardview shows only level 1 tasks.

From the level 1 task I can edit the subtask (level 2).

I would like to add a comment to this subtask, but it is stored at the level 1 task.

Although the comments area shows:

1) "Line 1 Subtask" which is wrong and should be Line 2

2) the edit area to enter the comment shows "Line 1 Task" which should be "Line 2 Subtask"

I believe this is a bug, what do you think?


Have a look at the animated gif

Tagged:

Best Answer

Answers

Sign In or Register to comment.