I have 3 dates (Calc, Planned and Actual). I want a logical function to check and pick the most accurate during the project lifecycle.
It starts with a Calculated date and then Planned is updated as the proposals come in. As the vendor prepares to mobile we shift to an Actual Date.
I can do 2 of the 3 but can't get that 3rd dimension. Ideas?