Hi, everyone. I am having an issue with dates when publishing a sheet to iCal.
The sheet has several date columns, and it has the following settings (images below):
- "warranty expiration" as the sole date for the calendar
- calendar enabled on publication
I added the published calendar to Outlook (O365) and the dates are not shown correctly: we have a shift of 2 or 3 days in advance (image below)
Am I missing any configuration?
Thanks. Nicolas Trejo