Ive built a project management system in SCC and have setup everyone to work from reports. If all goes well no one would ever go into a sheet.
If no one goes into the sheets ever, would the formulas and cell links and conditional formatting, etc update still? or do these require someone to enter a sheet (not a report) and let things update for a min, then save?