Set Task Duration from Formula
I have a project with many repeated subtasks, and sub-sub tasks. To generalize: Task A has Subtasks 1, 2, 3 Each subtask 1, 2, 3 has sub-sub-tasks a, b, c I would like to describe the duration for Subtask 1 with a, b, c in a general set at the bottom of the sheet. Can I link the duration of Subtask 1, 2, and 3 to the…
-
linksOutToCells return as null
I've tried using the C# SDK and directly to the API. In both cases the get specifies include=crossSheetReferences when getting the sheet. The Rows are returned and the Cells contain the correct data but in each case the linksOutToCells is null. What am I missing?
-
Issue with automation process reporting a date in a special column
In the Smartsheet sheet “CRS RO Master” we have programmed an automation called “Track Changes in dates, confirmation and LHG code” [PICTURE 1] This one should report a date of a change in the columns “CRS GO LIVE DATE” and “PMS Go LIVE DATE” in the column “. CRS Check date changed”. [PICTURE 2] The update of the “Go live…
-
Unable to Change or Delete Any Dates
I am unable to change any dates in my project schedule. It does not matter if it is a blank cell, automated cell, manually entered cell, new line I create, existing line, etc. — no matter what, if I attempt to modify a date, it just enters as 9/11/2025. This started last time I used my file. I have made sure cells aren't…
-
Links Not Working
Anyone else having issues with links to other Smartsheet sheets not working on and off? This is the second issue I have had this month. My table is not populating with the little arrow for the link showing as red versus blue. Error message says: Error: this link is invalid because the linked cell has been deleted. But, if…
-
Data mesh: Merging between sheets
I have 3 sheets: 2 of them have their own forms to collect data, and 1 master sheet. The 2 individual sheets have questions which are similar to each other and questions which are completely different (they are 2 forms of questionnaires). The master sheet is used to merge the answers of the similar questions and all other…
-
formulas with percentage
I pulled in a number from another sheet, % Complete from Plan, that is a percent and want to subtract this from 100%. This is the formula I am using: But it renders #UNPARSEABLE
-
Primary column data to other Sheet
I have 2 sheets, Sheet A has Primary column and I want to copy Sheet A primary column to sheet B. Sheet A has 2000 lines in primary column also whenever I update Sheet A primary column I need it should be updated in Sheet B too. how I can do this in Smartsheet?
-
Linking two sheets in a very specific way
Hello all! Like my title says, I am trying to link two smartsheets in a very specific way. I have a process in which I have individuals requesting support for specific courses this is tracked in one sheet. I then have a second process that hires people to provide support for those classes. Where I am running into trouble…
-
Paste Special > Links to copied cells is greyed out
Hello My option to paste special > links to copied cells is always greyed out, even when trying to paste into the same sheet and column. I've tried different browsers and sheets. Any help gratefully received!