Make dashboard widgets interactive and drillable (click into segments like Tableau)
Dashboard widgets are currently mostly static. I can display counts and charts, but I cannot click into a specific part of a widget to drill into the underlying records. It would be a big usability improvement if widgets supported interactive drill-down. For example: Click a bar segment (or stacked segment) to open the…
-
ODBC links are slow to update
Has there been a change to the system recently affecting ODBC links to data? I have a sheet that has been running for around a year which pulls together the results from several forms - the ODBC link is set to run automatically as soon as the file is opened, and up until a couple of weeks ago this was relatively quick…
-
Portfolio Reports - who can edit?
I have a report that uses the Portfolio as a source and is pointed to the project plan in the Control Center Blueprint. I would like PMs who view the report to only see the project plans they have been given editor permission on, but they are seeing a blank report. What am I missing?
-
Remove "Z" at the end of the date/time stamps in Seat Type Report date columns
The 3 Date/Time columns in the Seat Type Report include a "Z" at the end of the value (ex. 2025-11-11 00:07:27.000 Z). This prevents the field from being used as a date without manually removing it or creating a helper formula to remove it. Please remove the Z from the date/time in Last Paid Activity (UTC), Last Login…
-
Quick way to find scheduled send reports from across multiple reports/sheets
Kia ora, Is there a quick way to discover where scheduled send reports, from a report or a sheet, have been set-up, and then modify or delete their occurrence? I have multiple project sheets on the go, and at the close of each I go in and disable all automation workflows, however I don't have capacity (or memory) to check…
-
Is it possible to pull an activity log that includes a cell history report with time stamps?
Hi there. I am relatively new to Smartsheet and have been enjoying all the tools that this platform offers, but I want to see if I can make it work even better for me. I am essentially a process manager that sends reports to various stake holders via Smartsheet status changes The stake holders are dependent on the…
-
How can I pull data from two separate Jira instances projects to single sheet in Smartsheet?
I have two Jira projects which are related to same program but sitting in separate Jira instances. I want to pull tickets related to these Jira project in single sheet so that I can create Gantt Chart view and other reporting at single place for both.
-
Resource Manager Reports - date logic capability expansion
Resource Manager Reports need date logic capabilities beyond the standard last week, last month. Flexible logic like "today()- 2 months", or "today() + 6 months" etc. Having to update an existing report and or the resulting data and formulas each month so it displays the information that is needed rather than just enabling…
-
Merged: Built-In Sheet Health Metrics: Help Us Monitor Limits Before They Break Us
This discussion has been merged.
-
Item Changing with New Information Need Reporting Help
I have test for items a,b,c,d and a report that is pulling data from those tests. Occasionally I'll have an item that will turn to a version 2 now considered a2. Column information wont change. Now there will be an a, b, c, d, and a2 rows. What should I do to pull the correct information to my report now that a (the…