Managing and Reporting on Multiple Projects Effectively
I apologize for the length of my post, but I want to be thorough in describing what I would like to do and what I’ve already tried. I’ve also searched through help and the forums, and I either haven’t found a solution or am too hyperfocused on what I’m trying to do that I’ve missed it. I’m looking for a way to manage and…
-
Colors for chart widget not preserving settings
Hi all! I am fairly new to Smartsheet but have been taking training where I can to get up to speed. I'm stuck on one particular issue and I'm hoping someone can help. I set up a couple of donut chart widgets to track task status for a couple of sub-projects. These charts get data from a metrics sheet I set up. The idea is…
-
Locking in Colors for Charts in Dashboards (Avoiding category colors changing with dynamic data)
Hi, I am having an issue with Pie charts changing colors when data in the underlying sheets is altered. For example. If I have a pie chart with categories for task status: Not Started, In Progress, and Completed. Lets say I designate those colors Red, Yellow, and Green in the Pie Chart. If the underlying data changes so…
-
How do I avoid an export to Excel combining multiple cell values into one?
I have a sheet that contains cells that are populated from a multi-select drop-down. Many of those cells contain two or three separate values. When I export the sheet data to Excel, those multiple values get combined into a single value. For example: A cell in the sheet contains three category values: Content labeling,…
-
Sheet Summary Report Grand total row ?
I am bringing in 2 separate sheets into a sheet summary report using a custom column called "Total Revenue" which is a sum of each individual sheet's revenue rows The sheet summary report is showing correctly both rows for each sheet and the corresponding totals for each sheet. e.g. Miami $138,875 Tampa $264 My question is…
-
How to Change Background Color on Forms
Hello Community, How do you change the background color on submitted forms? The color is either green or yellow and the rows do not respond to background color changes or font color changes. Sometimes forms get submitted and then cancelled so I want to highlight the cancelled form rows red. Why can't the admin of a form…
-
"Save As New" Not Preserving Cross-References
Hello, I'm building a sheet in which I'm using lots of cross-references in the sheet summary. I plan to use it as an active metric field to display summary information from data in other sheets. I will need to copy the sheet about 30 times. I want to do this without breaking the cross-reference since it would be VERY time…
-
Protecting Folders From Admins In Workspace
I have template folders in a Workspace that either gets edited or deleted by Admins. I cant make them editors because then they cannot make folders and edit other documents that they need to work with. Is there a way to make it so certain folders can be protected? Thanks!
-
ODBC data pulls US date to mail merge
I am pulling information into a Microsoft Publisher label template from Smartsheet using ODBC smartsheet live data connector - this all works fine but any columns that are formatted in smartsheet as date columns are switched from UK format (DD/MM/YY) to US format (YYYY-MM-DD) and the only way I can find to resolve this is…
-
Is there a way to deal with "maybe situations" or varying predecessors?
Hi SmartSheet community! This may be an odd one to describe but I am going to try my best. I have a process that is a bit circular and is also a "maybe situation." For our product, we will go through rounds of optimization but only on an as-needed basis dependent on results. For example, we anticipate product A will need 4…