-
Content Sized to Widget Box
The chart inside the widget field is not scaling to the field and condenses some aspects of the chart if I bring the field boundaries in, but will not expand larger than seen below. The "scale data" selection in the horizontal axis is grayed out, I cannot select it. And changing the font sizes does not expand the overall…
-
Multi-Tier Control Center Resources
I'm working on building out a Control Center program for my company and recently learned of the multi-tier configuration and think it's the solution for us! As I go about building it, I haven't found any trainings on how to set up the multi-tier structure (my CSM already had it enabled, but want to understand the way it…
-
Calendar App: Custom Category List - Missing Options
I am currently using the Calendar App, where the source is a report. I am grouping the data by a category that exists on all sheets. However, one or more drop down options are missing in the "Custom Category List Order. Is this a bug or am I doing something wrong? The current outlier is "Tech Refresh." It does not show up…
-
Create contract using several rows?
Hi I have integrated DocuSign with Smartsheet in order to autogenerate contracts. This works just fine when I create a freelance contract using a single row for a single event. Optimally I would also like to create a contract that covers multiple events (different dates, venue addresses and rates) across an entire year,…
-
Can one form link to two sheets?
Hi, I created one form but can the data be linked to two different sheets? Thanks.
-
Is Smartsheet has the capability to pull data from SAP ?
I want to pull data from SAP report to Smartsheet. is there any integration and anything so I can pull data to SAP report to Smartsheet
-
Can Control Center be used to update Project Settings?
I haven't used Control Center yet, but I will be setting it up soon. Does Control Center allow for updating the Project Settings; like Working Days, etc..?? Or do I have to manually go to each and every project plan (and templates) in order to update these types of settings? Thanks! -Ray
-
Smartsheet Outlook Integration Error
Hello all. I am attempting to use the Outlook integration to add a new row to a sheet. However, I am bumping into the following error: Updating a cell in a column formula is not supported. columnId : 5669637140572036 My hunch is that it is referencing the checkbox column I have, which includes a column formula. First, what…
-
Data Shuttle Upload Merge
I have a sheet for tracking monthly KPIs from the vendors. For each month there is a Text/Number score column, a Symbols status column (uses a formula), a % change from the previous month expressed in numbers (uses a formula), and a Symbols change from the previous month expressed in up, down and sideways arrows (uses a…
-
dashboard
Each time I openen my dashboard the calendar are not updated (blank or other value)