Connection to Power BI for Resource Manager to allow custom reporting and combined reporting from other systems (eg. billing, timesheets etc...)
Sign in to see the current vote count, add your own vote, or leave a comment.
I agree this would be super helpful!
This would be super helpful as my BI team says they can access the data model directly. When connected through Smartsheet, it is able to access only the reports in the workspace
Although we are extremely proficient when it comes to reducing load on our smartsheets (we use pivot, data mesh and data shuttle extensively), we still find ourselves hitting capacity limits (mostly because of the number of columns in conjunction with some pretty complex formulas). Breaking up data between sheets and…
Be able to print and/or export Workflow Automations in PDF and/or export to Visio. this would be used for document control and troubleshooting aid
It would be extremely beneficial to have the ability to manually assign colors to individual projects within the Timeline View. Currently, project colors are automatically determined by the Dashboard Theme, which limits flexibility and makes it challenging to visually differentiate projects in a meaningful way. Allowing…