Cell Linking Autofill or other means when sheet too big
I sent in a comment to Customer Success that the sheet is getting slow performance. The response was bust it up into multiple sheets. Well I like the idea, I'm not sure I like the solution - it make everything now manual unless someone can tell me a better way.
The first four columns in my Master Sheet would need to be on every sheet, they hold critical status, dates, size, name of site. These factors are used in all calculations.
So if I make one sheet for summary of sizes.
One sheet for hours
One sheet for dates
Don't I now have the risk that a date is updated on the master sheet or a size? I must have cell linking to ensure they stay the same between sheets right?
So now even if I use Zapier to create a new row in the other sheets once a row is added to the Master sheet now I have to manually go in and create links for those key cells. Also my concern, aren't links one way? So if a person is working in the dates sheet and knows that it has changed, they enter it, but if link is from Master to Dates Sheet it won't update the master correct?
Seems like I have to now have manual step on multiple sheets to have data integrity to work around poor performance response. Is there another way? Do Links Autofill like a formula with the next row down each time a row is added?
Thoughts? Options?
Thanks
Comments
-
I'm currently having issues with a slow sheet as well, with less than 30 columns and less than 100 rows (though many lookups and references). I'm also curious about the answers to your questions
-
Got a solution for mine. I reorganized my sheet so the lookups had less data to deal with. I changed it from 21 search columns to 6 and it drastically increased the speed of my sheet. Hopefully you can do the same if you are using lookups.
Categories
- All Categories
- 14 Welcome to the Community
- Smartsheet Customer Resources
- 64.1K Get Help
- 414 Global Discussions
- 221 Industry Talk
- 461 Announcements
- 4.8K Ideas & Feature Requests
- 143 Brandfolder
- 141 Just for fun
- 58 Community Job Board
- 462 Show & Tell
- 32 Member Spotlight
- 1 SmartStories
- 299 Events
- 38 Webinars
- 7.3K Forum Archives