Sign in to submit new ideas and vote
Get Started

Flexible Duration value when calculating scheduling dates

It would be useful for the Duration to be dynamic (e.g. linking cell to a cell in another sheet or to contain a formulae) as part of the scheduling calculation to automatically derive the start/end dates for tasks in a Gantt Chart. It is quite common in a construction project for the Duration element of a task to be based on based a combination of volume and productivity (e.g. total widgets to be installed and productivity rate for installing widgets (i.e. x units/day) and for both/either of these parameters to change. In this scenario, I would not be expect to be able to change the start/end date for the task as both would always be calculated.

1
1 votes

Idea Submitted · Last Updated