Sign in to submit new ideas and vote
Get Started

Min - Max Durations on Gantt Schedules

It would be very helpful to input a minimum and maximum duration for an item and have the color bar shown with two tones. This would enable us to see where optimization is possible while still planning conservatively, or vice versa. There would need to be a setting for where to connect to the next item, i.e. minimum (best case), min+, average, max-, maximum (worst case).

Tags:
1
1 votes

Idea Submitted · Last Updated