I am trying to import into P6 the XML file from Smartsheet. The fields do not map correctly, for example start date maps to baseline start date. Also, Assigned Field in Smartsheet does not seem to map into P6 at all. I am working with 2 Smartsheets developed and owned by others. I am trying to use the Smartsheet info in a P6 master schedule. One does seem to map the dates correctly, the other does not. I assume there is a setup option different, but don't know where to look. Neither brings over Assigned To. Searched all over and can't find any guidance on this issue. Thanks