Hi all,
First time using smartsheet and haven't been able to figure it out. I searched on this forum and seems like back in the days people had similar issues. Not sure if it's been resolved or not. Here is the issue:
I have contractors that are helping with the project. I need to get a realistic timeline to know when their work finishes. When I put in different pieces of the work in smartsheet, it overlaps them although the resource is the same. So it basically shows that everything can be done with a week (the largest chunk of work takes 5d). I'm not sure what to do for smartsheets to consider that this the same resource and can't do 10 things at once. I don't want to create irrelevant dependency across the work just to be able to stretch the timeline.
The other issue I'm dealing with is that the estimates are off (or unexpected things happen) and the contractors are actually behind. So if a piece of work is 50% complete and was supposed to be done yesterday, it will actually take another 50% of the original estimate to finish the work from TODAY. Smartsheets seems like to be agnostic to that and still shows that in the timeline the work was supposed to be done yesterday. How can I adjust for that without really hacking into the timeline and length of project?
Thanks for your time
Amir