I have multiple project gantts that I would like to summarize on one sheet. So far, I can only link the top-level task to the summary sheet. Cell linking ignores the project hierarchy. If I try to link the entire project the hierarchy gets flattened and I would have to re-indent everything on the summary sheet.

It would be really helpful if cell linking also carried along child rows and kept the structure of the source.