We are using our sheets for sidewalk repairs. An inspector in the field will open the form in the field, on his phone, fill out the basic information (type of work, address). The sheet will auto-popul…
help me please I want to see in our project through a filter in which I specify: 1) If the status is not fulfilled 2) Deadline date in the past This is all I can do, but through the filter I need 3 p…
Hello all! I am brand new and have no idea what I'm doing yet. lol! I was wondering, is there a setting that will label colums like in Excel (A,B,C etc). I can't tell if a column is hidden just by loo…
My example is to select an material size value based on the material. Something like this: If [cell1]="4X8 Sheet" then [cell2]=32, if [cell1]="4X12 Sheet" then [cell2]=48, etc, etc. I have a dropdown …
I'm running a landscape installation company in Smartsheet and I'd like to set up a way to send an automated weekly email to the client's email address stored in a contact column with their jobs that …
Hello, I figured out how to make work a large formula for =Sumifs. The idea was to add the "target budget" of all projects that would have as Project Manager (PM/RI) "Mari M." and only for the project…
Hi, I'm trying to schedule 2 dates form the same line into a calendar. For example. Each time we sell a job, the job has a Part A installation, and a Part B installation. With this the line would have…
I have a master spreadsheet that details the progress of a project. I'm in the process of rolling all the information on that sheet into another that consolidates anywhere from 1-100 lines (check boxe…